Hello,
I am moving up from my 50 gallon to a 95 Wave-Front. I got the halides/flour hood, a wave machine, a corner overflow coming in the mail. I'm going to drill out the back (the bottom is tempered glass) with two holes and route my plumbing through that.
I think I've got that part figured...