burning2nd
Well-known member
after about 2 years of planing figureing out what i wanted where and how..
Ive got my 75 system on the start (really this time)
I have about 100lbs of figi and other rock from Nc, also have some more rock thats still dry.. The sump is thur the wall but not plumbed up yet, I choose to go with flex line all the way to and back, seems easy'r then pvc and a lot simpler,
two new bulk heads.. 1" union ball valve right after the drain bulk head,
5/8 return also he same bulk head to ball valve not union on the retrun side. but
then i went to barb fitting,
this is just temp, i just moved the rock over last night
i also took my marron clown from the 10g upstarirs and move him and a solo hermit down,
the 10 is infected with byposis so ill be working on that,
i screwd up my first salt water pvc job,
I put the slip connector for the union on the 1"tube and then relized i needed to put the right on first, but its all together, no leaks and ready for the sump to be added sometime this week,
the sump just needed the baffles glued, and then i need to order a skimmer, move the controller from the 10g down to the 75, after i get the small tank under control ill frag and dissaemble,
gotta condense my hole operation,
Ive got my 75 system on the start (really this time)
I have about 100lbs of figi and other rock from Nc, also have some more rock thats still dry.. The sump is thur the wall but not plumbed up yet, I choose to go with flex line all the way to and back, seems easy'r then pvc and a lot simpler,
two new bulk heads.. 1" union ball valve right after the drain bulk head,
5/8 return also he same bulk head to ball valve not union on the retrun side. but
then i went to barb fitting,
this is just temp, i just moved the rock over last night
i also took my marron clown from the 10g upstarirs and move him and a solo hermit down,
the 10 is infected with byposis so ill be working on that,
i screwd up my first salt water pvc job,
I put the slip connector for the union on the 1"tube and then relized i needed to put the right on first, but its all together, no leaks and ready for the sump to be added sometime this week,
the sump just needed the baffles glued, and then i need to order a skimmer, move the controller from the 10g down to the 75, after i get the small tank under control ill frag and dissaemble,
gotta condense my hole operation,