Markstr
Well-known member
I know there are a few pictures that illustrate this ??
Generally,
In my Corner overflow box, can you not just have bulkhead down
below, PVC pipe coming up to highest point and 2-90's to top it off??
I've seen some where there is a hole drilled as well..
I have a wet/dry down below, and it has (2) of the flex hoses coming up to
the Corner overflow box (Undernieth) ..
Generally,
In my Corner overflow box, can you not just have bulkhead down
below, PVC pipe coming up to highest point and 2-90's to top it off??
I've seen some where there is a hole drilled as well..
I have a wet/dry down below, and it has (2) of the flex hoses coming up to
the Corner overflow box (Undernieth) ..