In designing my 140 FOWLR, I have determined that I want 1 corner overflow. I can get a custom from the LFS that has 3 bulkheads (will discuss the size of the bulkheads with them later). My plan is to use 2 sumps (1 fuge and 1 actual sump) that will be tied together at the return chambers to prevent any overflows. I would like to utilize 2 return pumps for redundancy (I travel a lot and want to make this easy on the wife).
My question is this - If I stay with 3 bulkheads in the overflow, 2 drain (1 for each sump) and 1 return and I tie the 2 sump return chambers together with 1-1/2" or 2" pvc, can I use 2 return pumps in parallel that manifold into 1 return line? I am looking for about 3-4x from total from the pumps combined (+/- 700gph).
My question is this - If I stay with 3 bulkheads in the overflow, 2 drain (1 for each sump) and 1 return and I tie the 2 sump return chambers together with 1-1/2" or 2" pvc, can I use 2 return pumps in parallel that manifold into 1 return line? I am looking for about 3-4x from total from the pumps combined (+/- 700gph).