Progress is very slow.....I had hoped to have water in the system by this morning. Plywood is cut and installed, finish nails and glue. Main stad access door is cut out and edges routered, along with a small door out the back for ventilation and cord access. Last night was able to get a hole cut to install my RK2 in the right side panel. All the interior seams have been sealed and I hope to get the primer and paint on the inside this weekend. It should be able to hold about 4 gallons of overflow of the sump before water would run out on the floor!! I flooded my old hex tank many times so I built this stand with a little reservior capability. I will take some pictures in a bit when I get it in the house to warm it up for painting.