tamarindthai
Well-known member
i'm setting up the new tank 125 gals,,gonna start off with the FO with live rock
i want to used the 2 check valves 1 1/4",,come right off from the bottom of the tank,,,for the return,how the liable of CV and CV failure(why i thinking of using 2CV in series),,could anybody tell me ,that is such a good idea?
thanks in advance.
i want to used the 2 check valves 1 1/4",,come right off from the bottom of the tank,,,for the return,how the liable of CV and CV failure(why i thinking of using 2CV in series),,could anybody tell me ,that is such a good idea?
thanks in advance.