burning2nd
Well-known member
Hey guys... long time no speak.. All is well,
marriage, house, kids, work..
and a new build
Ive been working on this for a while, and im almost ready to pull the trigger on liquid from what i can tell i have everything but what i need to finish the plumping
b4 this all started i had my 75g i broke that down to my original 30 after i lost my clown fish of 15 years, with out fish it is very easy to make a tank modular
so i acquired this 125 for free and most of the stuff with it..
this is the dt.. we redid the entire room so everything started with the carpet so now that the tank is in place on the stand on the new floor..
this is what i want to do (and i think im going to do most of it with flexiable black pvc tube (plus some barb fittings)
see that panel to the right of the outlet? that opens to a nice finished hole in the floor thats how im going to get my feed and return to my sump.. all of the equipement except for a few power heads and the lights will be down stairs
*well that hole in the cealing isnt finished because i dont know how i want to do this just yet
so here come the questions
marriage, house, kids, work..
and a new build
Ive been working on this for a while, and im almost ready to pull the trigger on liquid from what i can tell i have everything but what i need to finish the plumping
b4 this all started i had my 75g i broke that down to my original 30 after i lost my clown fish of 15 years, with out fish it is very easy to make a tank modular
so i acquired this 125 for free and most of the stuff with it..
this is the dt.. we redid the entire room so everything started with the carpet so now that the tank is in place on the stand on the new floor..
this is what i want to do (and i think im going to do most of it with flexiable black pvc tube (plus some barb fittings)
see that panel to the right of the outlet? that opens to a nice finished hole in the floor thats how im going to get my feed and return to my sump.. all of the equipement except for a few power heads and the lights will be down stairs
*well that hole in the cealing isnt finished because i dont know how i want to do this just yet
so here come the questions