DonW
R.I.P.
Here it is 2.5 hours and almost done. Pump wont be here till next week so Ill plumb it then. All joints are rabbited. The riser joint is a self centering o-ring flange. The riser is actually three pieces 3" in the cup, 5" riser and 1/4" flange center all sitting in rabbits. Of course the lid is key holed with oring. Total height is 30".
Don
Don