Well first of all the tank will be FOWLR. I began construction on my wall last night (May 27th) as of today after about 7 hours total labor I have framed in the stand into a closet on the opposite sid of the wall and cut out the whole in the wall and re-framed it to fit my tank, also I have sheetrocked the area around the opening... lets just say that for 7 hours I have cranked out a lot of work on this project... So here are some photo's as to what I have accomplished so far.
These photo's show the wall before construction, the inside of the closet, and the size of the opening for the tank...
These photo's show the wall before construction, the inside of the closet, and the size of the opening for the tank...