any advice on swapping the sump out? i mean, it sounds simple in my head
drain
remove equipment
move the new sump/stand into place
i'll have to replumb a bit on the overflow in because of the height
replace equipment
i'm sure there will be a bunch of problems in between those things, so i'd like to try to prep.
is it better to let the pvc glue go overnight or a couple of days? when i did it previously, it water tested (with tap) for a while before i swapped the water out for for salt.... i've read about people using it right after glueing, just not sure i'm ok with that...