I started this new thread for the folks that have not followed my build, and for the people who have been waiting to see this build finished.
I'll keep it simple with a light review of the build. This project was a direct result of a seam going bad.
That led to this
Lucky for me I had enough 3/4 acrylic stashed in the shop to build another 90gal AIO, with reinforced corners.
I started with the sump/fuge section. It will be welded to the right side of the DT. The flow is provided by a Maxijet 600
I am using a BH 1000 HOB skimmer. This will hang on the back of the tank and the skimmer will pull water from this overflow jig
I made these to weld in all the inside corners. Overkill? YES!!!!
Water into the fuge/sump water out. The sump attatches to the slotted side
Corners all glued in
The tank is a Bare bottom. This closed loop rig will keep the bottom of the tank cleaner
Added black to the sump wall. This is water in and water out
Water leak/flow test
I'll keep it simple with a light review of the build. This project was a direct result of a seam going bad.
That led to this
Lucky for me I had enough 3/4 acrylic stashed in the shop to build another 90gal AIO, with reinforced corners.
I started with the sump/fuge section. It will be welded to the right side of the DT. The flow is provided by a Maxijet 600
I am using a BH 1000 HOB skimmer. This will hang on the back of the tank and the skimmer will pull water from this overflow jig
I made these to weld in all the inside corners. Overkill? YES!!!!
Water into the fuge/sump water out. The sump attatches to the slotted side
Corners all glued in
The tank is a Bare bottom. This closed loop rig will keep the bottom of the tank cleaner
Added black to the sump wall. This is water in and water out