TJL
copod
Thanks guys, its been alot of fun building the stand so far yet more challenging designing the cabinetry to fit existing doors instead of the other way around. Looks like maybe Saturday will be nice enough to open the garage door and apply some more varnish. Then onto the canopy/LED build and plumbing in the sump/fuge and closed-loop. Also have been helping Rob out for the soon to be re-opening of Red 'C' Aquarium.
Cheers, Todd
Cheers, Todd